|
Simple Linear Regression
|
|
|
|
Basics of Regression - meaning , cross sectional data , time series data ,pooled data, panel data
14:00
|
|
|
|
Two variable Regression
25:00
|
|
|
|
Coefficient of Determination-R Squared.
11:00
|
|
|
|
Regression estimation -Derivations of B1 and B2
22:00
|
|
|
|
MCQ Test
|
|
|
Hypothesis Testing
|
|
|
|
MCQ Test
|
|
|
|
P-Value Explained _Regression _Hypothesis Testing
9:00
|
|
|
Extension of Two variable linear regression Model
|
|
|
|
Regression Through Origin
14:00
|
|
|
|
Functional form of Regression | Regression Analysis
15:00
|
|
|
|
Regression on Standardised Variables
12:00
|
|
|
|
Scaling and unit of measurement _Econometrics_ Regression
18:00
|
|
|
|
MCQ Test
|
|
|
Multiple Regression: Problem Estimation
|
|
|
|
Multiple Regression Analysis-Econometrics
15:00
|
|
|
|
R Squared and Multiple Regression Model-Econometrics
13:00
|
|
|
|
R -Squared and Adjusted R-Squared
11:00
|
|
|
|
MCQ Test
|
|
|
Multiple Regression: Problem Inferences
|
|
|
|
F Test and Multiple Regression _ Econometric
14:00
|
|
|
|
Chow Test _ Test of Parameter Stability _ Econometrics
12:00
|
|
|
|
Marginal contribution of Explanatory Variables and Multiple Regression.
10:00
|
|
|
|
Restricted Least Square - Multiple Regression
21:00
|
|
|
Dummy Variables
|
|
|
|
Dummy Variables and Regression Analysis
17:00
|
|
|
|
Interaction Effect and Dummy Variable
8:00
|
|
|
|
Dummy variables and Seasonal Analysis _Econometrics.
5:00
|
|
|
|
Dummy Variables and Regression Analysis
17:00
|
|
|
|
Interaction Effect and Dummy Variable
8:00
|
|
|
|
Dummy Variables alternate to Chow Test
12:00
|
|
|
Multicollinearity
|
|
|
|
Multicollinearity Detection and Remedies.
22:00
|
|
|
|
Multicollinearity and Consequences
22:00
|
|
|
Heteroscedasticity
|
|
|
|
Heteroscedasticity _ Causes and Consequences
27:00
|
|
|
|
Heteroscedasticity _ Detection and Remedies
26:00
|
|
|
Autocorrelation
|
|
|
|
Autocorrelation: Causes and Consequences
23:00
|
|
|
|
Durbin Watson D Test _ Autocorrelation
21:00
|
|
|
|
Remedies for Autocorrelation
13:00
|
|
|
Model Specification Errors
|
|
|
|
Omitted Variable_ Model Specification Error
14:00
|
|
|
|
D Test Model Specification Error
5:00
|
|
|
|
Overfitting of Model _ Model Specification Error
7:00
|
|
|
|
Ramsey RESET Test
5:00
|
|
|
Panel Data Regression Model
|
|
|
|
Panel Data _ Pooled Data Method or Grand Regression OLS Method.
19:00
|
|
|
|
Random Effect Model _ Panel Data
11:00
|
|
|
|
Panel Data _ Pooled Data Method or Grand Regression OLS Method.
19:00
|
|
|
Qualitative Regression
|
|
|
|
Logit and Probit Models
15:00
|
|
|
|
Linear Probability Model
15:00
|
|
|
Autoregressive and Distributed Lag Model
|
|
|
|
Auto-regressive and Distributed lag Models
10:00
|
|
|
|
Koyck Approach to Distributed Lag Model
17:00
|
|
|
|
Granger Causality Test
17:00
|
|
|
Simultaneous Equations
|
|
|
|
Simultaneous Equation _ Econometrics
10:00
|
|
|
|
Structural Equation and Reduced Form Equation
13:00
|
|
|
|
Order condition _ Identification Problem
14:00
|
|
|
|
Recursive Method and OLS
9:00
|
|
|
|
Two stage least Square Method_ simultaneous equation
10:00
|
|
|
|
Indirect Least Squares Method _ Simultaneous equations
17:00
|
|
|
Time Series -Concepts
|
|
|
|
Stationary Time Series
10:00
|
|
|
|
Non stationary Time Series
15:00
|
|
|
|
Unit Root Test or Dickey Fuller Test
15:00
|
|
|
|
Co-Integration and Engle Granger Test
9:00
|
|
|
|
Spurious Regression or Nonsense Regression
7:00
|
|
|
|
Co-Integration and Error Correction Model
6:00
|
|
|
Time Series Forecasting
|
|